Dramatic roof line above the frame for the front entrance

Frame built for number 3

Construction of our third home is powering along, even with the attention given to Sustainable House Day for the first and cladding the second. Pouring the concrete slab paved the way for building the frame and installing the roof.

x Logo: Shield Security
This Site Is Protected By
Shield Security